Founded in Singapore in 2022 by a small operator-led team. Three plants under management by 2028. One process — catalytic pyrolysis — done at industrial scale, under long-term offtake, with aligned ownership.
Elevated Elements incorporated in Singapore by a small operator-led team.
Site MOU and EPC contract signed for the Nakhon Ratchasima facility.
Plant I structurally complete; commissioning underway.
First batch of pyrolysis oil dispatched under long-term offtake.
Plant II in hot commissioning; Plant III SPV signed with Bà Rịa-Vũng Tàu Province.
Three plants, two regions, one process. Target operational capacity reached.

Twenty years across petrochemical operations and project development.

Thomas has more than 50 years of experience in chemical recycling and has developed recylcing projects globally.

15+ years driving sustainable growth, innovation, and internationalization in manufacturing, digitalisation, and finance.

Alex has been working on our first plant from day one - and ensures that we achieve our production and quality targets.

Project-finance background. Structured the offtake-secured model that anchors EEG's capital raises.

Waste-management strategist. Leads engagements with regional aggregators and offtake counterparties.

Built the offtake book across Asia. Twelve years at a major chemicals trading house before joining EEG in 2024.

Materials chemist. Runs the Singapore catalysis lab and the regeneration programme that extends catalyst life across the SPV fleet.

Industrial safety lead across all three plants. ISO 45001 / ISO 14001 implementation owner.
Most of the team has commissioned, run, or scaled a real plant. We design what we know we can build.
Catalytic pyrolysis is a 30-year industrial transition. We hire — and capitalise — for that horizon.
Real numbers in case studies; real numbers in pitches. The work is the marketing.
We hold majority equity in the SPVs we operate. We don't take fee-only mandates.
Operations, R&D, finance, executive team. The plant operations and consulting groups are based here.
On-site team for Plant I. Field training site for incoming SPV operations engineers.
Project office for Plant II (commissioning) and Plant III (FID closed).